Tiled balconies and terraces
Review falls, outlets, edge terminations and the intended tile or protective build-up before selecting a grade.
A liquid polymer and cementitious powder system for waterproofing where flexibility matters. Consider it for approved concealed or under-tile assemblies where changes in substrate and temperature affect product selection.
Evaluate restrained movement across the coated field and detail joints and boundaries separately. The finish and exposure determine the complete layer build-up.
Review falls, outlets, edge terminations and the intended tile or protective build-up before selecting a grade.
Check transitions between floors and walls, pipe collars and drain flanges in concealed waterproofing assemblies.
Explore applicationMatch the system to the approved substrate and protection layers. Review the local stresses around upstands and changes in section.
Identify cracks, joints and changes in substrate. Have the project team define separate details where movement must be accommodated.
Confirm the system at drains, corners and penetrations and verify compatibility with the tile adhesive or protection layer.
Batch the matched liquid and powder, observe the usable working time and protect the coating as it cures.
Start with the required movement performance and the finish. Request matching test conditions for any data used in the comparison.
View both polymer-cement coatingsGive the movement joint its own approved detail. The grade’s crack-bridging value applies within the declared test conditions for the coating.
The correct finish depends on the grade and service conditions. Confirm the exposed or protected assembly and any traffic requirements before ordering.
Compare grade-specific crack-bridging data, eligible substrates, curing and the intended finish. Both are polymer-cement systems and should be evaluated against the same project criteria.
Share the assembly drawing, substrate, expected movement, finish, drainage details and estimated area. Include the destination and any specified crack-bridging test.